Exam Details
Subject | Surveying | |
Paper | ||
Exam / Course | B.Tech Civi Engg. (BTCLEVI)/B.Tech Electronics And Communication Engg. (BTECVI) | |
Department | School of Engineering & Technology (SOET) | |
Organization | indira gandhi national open university | |
Position | ||
Exam Date | June, 2016 | |
City, State | new delhi, |
Question Paper
What are the basic principles of surveying? Explain with sketches wherever required.
Discuss briefly various phases of survey work.
A chain was tested before starting the survey work and was found to be exactly 20 m. At the end of the survey work it was tested again and was found to be 20·12 m. Area of the plan of the field drawn to a scale of 1 cm m was 50·4 cm^2. Find the true area of the field in sq. metres.
Explain with a neat sketch the working of a prismatic compass.
What is local attraction How is it detected?
Explain how closing error in compass survey is adjusted by Bowditch method.
Describe the resection table surveying method of plane
What are surveying? the errors in plane table
What are the advantages and disadvantages of plane table surveying?
Explain reciprocal levelling.
The following consecutive readings are taken with a dumpy level and a 4 m levelling staff, along a continuously sloping line AB at a common interval of 20 m
0.385, 1.030, 1.925,2.825,0.625,2.005,3.110.
The RL of the first point was 200.00 m. Enter the readings in a level book and calculate the RLs of each point by rise and fall method and calculate the gradient of the line joining the first and the last points.
Explain the temporary adjustment of transit theodolite.
Explain as to how you will measure horizontal angle by the method of repetition.
What are the different sources of errors in theodolite survey? Explain.
What are the effects of curvature of the Earth and refraction on the accuracy of levelling Derive an expression for the corrections due to both the effects.
7. Write short notes on any four of the following:
Benchmark
Reduced Level
Centering
Line of Collimation
Geodetic Surveying
Indirect Ranging
Discuss briefly various phases of survey work.
A chain was tested before starting the survey work and was found to be exactly 20 m. At the end of the survey work it was tested again and was found to be 20·12 m. Area of the plan of the field drawn to a scale of 1 cm m was 50·4 cm^2. Find the true area of the field in sq. metres.
Explain with a neat sketch the working of a prismatic compass.
What is local attraction How is it detected?
Explain how closing error in compass survey is adjusted by Bowditch method.
Describe the resection table surveying method of plane
What are surveying? the errors in plane table
What are the advantages and disadvantages of plane table surveying?
Explain reciprocal levelling.
The following consecutive readings are taken with a dumpy level and a 4 m levelling staff, along a continuously sloping line AB at a common interval of 20 m
0.385, 1.030, 1.925,2.825,0.625,2.005,3.110.
The RL of the first point was 200.00 m. Enter the readings in a level book and calculate the RLs of each point by rise and fall method and calculate the gradient of the line joining the first and the last points.
Explain the temporary adjustment of transit theodolite.
Explain as to how you will measure horizontal angle by the method of repetition.
What are the different sources of errors in theodolite survey? Explain.
What are the effects of curvature of the Earth and refraction on the accuracy of levelling Derive an expression for the corrections due to both the effects.
7. Write short notes on any four of the following:
Benchmark
Reduced Level
Centering
Line of Collimation
Geodetic Surveying
Indirect Ranging
Other Question Papers
Departments
- Centre for Corporate Education, Training & Consultancy (CCETC)
- Centre for Corporate Education, Training & Consultancy (CCETC)
- National Centre for Disability Studies (NCDS)
- School of Agriculture (SOA)
- School of Computer and Information Sciences (SOCIS)
- School of Continuing Education (SOCE)
- School of Education (SOE)
- School of Engineering & Technology (SOET)
- School of Extension and Development Studies (SOEDS)
- School of Foreign Languages (SOFL)
- School of Gender Development Studies(SOGDS)
- School of Health Science (SOHS)
- School of Humanities (SOH)
- School of Interdisciplinary and Trans-Disciplinary Studies (SOITDS)
- School of Journalism and New Media Studies (SOJNMS)
- School of Law (SOL)
- School of Management Studies (SOMS)
- School of Performing Arts and Visual Arts (SOPVA)
- School of Performing Arts and Visual Arts(SOPVA)
- School of Sciences (SOS)
- School of Social Sciences (SOSS)
- School of Social Work (SOSW)
- School of Tourism & Hospitality Service Sectoral SOMS (SOTHSM)
- School of Tourism &Hospitality Service Sectoral SOMS (SOTHSSM)
- School of Translation Studies and Training (SOTST)
- School of Vocational Education and Training (SOVET)
- Staff Training & Research in Distance Education (STRIDE)
Subjects
- Advance Surveying
- Advanced Design Of Foundation
- Advanced Environmental Engineering
- Advanced Structural Analysis
- Bachelor Of Technology (Ce)
- Building Technology -I
- Civil Engineering
- Computational Methods In Structural Engineering
- Earth And Rock Fill Dam Engineering
- Elements of Engineering Science
- Engineering Geology
- E n v i r o n m e n t a l E n g i n e e r i n g I I
- Environmental Engineering-I
- Estimation And Construction Management
- Geoinformatics
- Geotechnical Engineering - II
- Mathematics-III
- Pavement Evaluation
- Quantity Surveying and Costing
- Reliability And Optimization Of Structures
- Structural Analysis - II
- Structural Analysis - III
- Structural Analysis I
- Structural Design And Drawing - I
- Structural Design And Drawing - II
- Surveying
- Traffic Engineering
- Transportation Engg. II
- Transportation Engineering - I
- Transportation Planning
- Water Resources Engineering
- Water Resources System Planning And Design