Question Paper
Page 1 of 4
Seat No.: Enrolment
GUJARAT TECHNOLOGICAL UNIVERSITY
MBA -SEMESTER 02- EXAMINATION SUMMER 2017
Subject Code: 2820006 Date: 09/06/2017
Subject Name: Production and Operations Management
Time: 10.30 AM TO 01.30 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Multiple Choice Questions.
6
Q.1(a)
is the cost to prepare a machine or process for manufacturing an order
1.
A.
Set up
B.
Initial
C.
Bottleneck
D.
Backlog
2.
Which of the following is an inventory system?
A.
Two bin system
B.
Ishikawa
C.
Coordination of operational goals
D
Andon
3.
a tool for evaluating capacity alternatives?
A.
Gantt chart.
B.
P.E.R.T.
C.
Decision Tree
D.
All of the above
4.
aims at preventing the defects rather than detecting the defects.
A.
Quantity
B
Zero based budgets
C.
Conformance
D
Quality
5.
Which of the following is not a method of evaluating facility location alternatives.
A.
Factor -Rating
B
Locational Break even analysis method
C.
Qualitative factor analysis
D
Ishikawa
6.
Average successive time between completion of successive units is
A.
Utilization
B.
Cycle Time
C.
Process
D.
Pacing
Q.1
Explain the following
1. Independent demand.
2. Kanban.
3. Process capability ratio.
4. Acceptance Sampling.
04
Q.1
Define Operations Management. Discuss in brief 'production as transformation process'.
04
Q.2
Explain along with advantaged and disadvantages, any two facility layout in detail.
07
Page 2 of 4
TIM incorporated produces copper contacts that it uses in switches and relays. TIM needs to determine the order quantity to meet the annual demand at the lowest cost. the price of copper depends on the quantity ordered. Here are price break and other data for the problem:
Annual demand 50,000 tons per year
Holding cost 20 percent per unit per year of the price of the copper
Ordering cost 30 Rs.
Price of copper
Rs 0.82 per ton up to 2499 tons
Rs. 0.81 per ton for orders between 2500 and 5000 tons
Rs. 0.80 per ton for orders greater than 5000 tons.
What quantity should be ordered?
07
OR
Which are the required Inputs to the Production Planning System?
07
Q.3
Define and explain various costs of quality that a producer should consider while designing quality management issues.
Neutron Inc. is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 0.003 inches. After a trial run on this machine, Manufacturer has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch. Calculate the Process capability index and whether the manufacturer should use this machine to produce this part?
04
03
Enlist and enumerate factors that will affect the choice of a site for a readymade garment manufacturing facility in India.
07
OR
Q.3
6 jobs with processing times on machine A B have to be sequenced optimally. The time taken for operations on machine A B are given below:
Apply Johnson's rule, determine the optimal sequence of processing the job. Also determine the cycle time and idle times on machine B.
Job
Machine A (Time in hours)
Machine B
J1
8
4
J2
6
7
J3
5
5
J4
7
4
J5
3
6
J6
9
8
07
What do you understand by the term (PPC)'Production Planning and Control? Explain objectives of PPC
07
Q.4
Discuss elements of lean production system.
07
Explain principles of material handling that should be followed for effective and reliable material planning
07
OR
Q.4
Describe and explain assumptions and limitation of Critical Path Method.
07
Page 3 of 4
An established company has decided to add a new product t its line. It will buy the product from a manufacturing concern, package it sell it to a number of distributors that have been selected on a geographical basis. Market research has already indicated the volume expected and the size of sales force required. following table shows the description.
Activity
Description
Predecessors
Duration(days)
A
Organize Sales office
6
B
Hire salesman
A
4
C
Train salesman
B
7
D
Select ad agency
A
2
E
Plan ad agency
D
4
F
Plan ad campaign
E
10
G
Conduct ad campaign
2
H
Design package
G
10
I
Setup ad package
H
6
J
Package initial stocks
13
K
Order stock from manufacturer
A
9
L
Select distributors sell
K
3
M
Ship stocks to distributors
L
5
Draw Network diagram
Indicate critical path
For each non critical activity, find total free float
07
Q.5
The Orange bus company manufacture buses for different purposes.
The Orange bus objective is to provide expert, bespoke minibus conversions for individual customers, companies and charities. The corporate ethos of 'driving quality' focuses the company to continuously look at improving the quality and effectiveness of its products and services. This is demonstrated through high staff morale, increased sales and most importantly satisfied customers. Although The Orange bus was already successfully measuring the quality of its builds and processes informally, the company wanted to put in place a more formal structure to improve operational efficiency and drive market share. The Orange bus decided that a quality certificate would provide the ideal framework to achieve this.
Successful certification may enable The Orange bus to gain national recognition as a quality company which consistently builds a high quality product. The majority of motor manufacturers insist on certification to this standard and The Orange bus has, subsequently achieved national accreditation and approval from these manufacturers due to its outstanding quality.
Auditing is performed monthly and continues to highlight opportunities for process improvements. Non-conformities and corrective actions are religiously logged, enabling The Orange bus to learn from mistakes and put in place initiatives to prevent recurrences of problems. Now that the company monitors each stage of the vehicle build, preventative action means that warranty costs have substantially reduced. The management system also helps the monitoring of customer feedback. As a result of this feedback, the company now offer a 36-month warranty which demonstrates firstly that they do listen to our customers, and, secondly
14
Page 4 of 4
that they have confidence in the build quality of the product. The only other obstacle they faced was helping staff understand why they were implementing certification.
Explain the quality tool that can be applied in the above case?
How will the employees access their role in quality management?
OR
Q-5
The following table gives data on normal time, cost and crash time and cost for a project.
Activity
Normal time
Normal cost
Crash time
Crash cost
1-2
3
300
2
400
2-3
3
30
3
30
2-4
7
420
5
580
2-5
9
720
7
810
3-5
5
250
4
300
4-5
0
0
0
0
5-6
6
320
4
410
6-7
4
400
3
470
6-8
13
780
10
900
7-8
10
1000
9
1200
Indirect cost is Rs. 50 per week.
1)Draw network diagram for project identify the critical path.
What are the normal project duration associated cost?
Find out the total float associated with each activity.
4)Crash the relevant activities systematically determine the optimal project completion time and cost.
14
Seat No.: Enrolment
GUJARAT TECHNOLOGICAL UNIVERSITY
MBA -SEMESTER 02- EXAMINATION SUMMER 2017
Subject Code: 2820006 Date: 09/06/2017
Subject Name: Production and Operations Management
Time: 10.30 AM TO 01.30 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Multiple Choice Questions.
6
Q.1(a)
is the cost to prepare a machine or process for manufacturing an order
1.
A.
Set up
B.
Initial
C.
Bottleneck
D.
Backlog
2.
Which of the following is an inventory system?
A.
Two bin system
B.
Ishikawa
C.
Coordination of operational goals
D
Andon
3.
a tool for evaluating capacity alternatives?
A.
Gantt chart.
B.
P.E.R.T.
C.
Decision Tree
D.
All of the above
4.
aims at preventing the defects rather than detecting the defects.
A.
Quantity
B
Zero based budgets
C.
Conformance
D
Quality
5.
Which of the following is not a method of evaluating facility location alternatives.
A.
Factor -Rating
B
Locational Break even analysis method
C.
Qualitative factor analysis
D
Ishikawa
6.
Average successive time between completion of successive units is
A.
Utilization
B.
Cycle Time
C.
Process
D.
Pacing
Q.1
Explain the following
1. Independent demand.
2. Kanban.
3. Process capability ratio.
4. Acceptance Sampling.
04
Q.1
Define Operations Management. Discuss in brief 'production as transformation process'.
04
Q.2
Explain along with advantaged and disadvantages, any two facility layout in detail.
07
Page 2 of 4
TIM incorporated produces copper contacts that it uses in switches and relays. TIM needs to determine the order quantity to meet the annual demand at the lowest cost. the price of copper depends on the quantity ordered. Here are price break and other data for the problem:
Annual demand 50,000 tons per year
Holding cost 20 percent per unit per year of the price of the copper
Ordering cost 30 Rs.
Price of copper
Rs 0.82 per ton up to 2499 tons
Rs. 0.81 per ton for orders between 2500 and 5000 tons
Rs. 0.80 per ton for orders greater than 5000 tons.
What quantity should be ordered?
07
OR
Which are the required Inputs to the Production Planning System?
07
Q.3
Define and explain various costs of quality that a producer should consider while designing quality management issues.
Neutron Inc. is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 0.003 inches. After a trial run on this machine, Manufacturer has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch. Calculate the Process capability index and whether the manufacturer should use this machine to produce this part?
04
03
Enlist and enumerate factors that will affect the choice of a site for a readymade garment manufacturing facility in India.
07
OR
Q.3
6 jobs with processing times on machine A B have to be sequenced optimally. The time taken for operations on machine A B are given below:
Apply Johnson's rule, determine the optimal sequence of processing the job. Also determine the cycle time and idle times on machine B.
Job
Machine A (Time in hours)
Machine B
J1
8
4
J2
6
7
J3
5
5
J4
7
4
J5
3
6
J6
9
8
07
What do you understand by the term (PPC)'Production Planning and Control? Explain objectives of PPC
07
Q.4
Discuss elements of lean production system.
07
Explain principles of material handling that should be followed for effective and reliable material planning
07
OR
Q.4
Describe and explain assumptions and limitation of Critical Path Method.
07
Page 3 of 4
An established company has decided to add a new product t its line. It will buy the product from a manufacturing concern, package it sell it to a number of distributors that have been selected on a geographical basis. Market research has already indicated the volume expected and the size of sales force required. following table shows the description.
Activity
Description
Predecessors
Duration(days)
A
Organize Sales office
6
B
Hire salesman
A
4
C
Train salesman
B
7
D
Select ad agency
A
2
E
Plan ad agency
D
4
F
Plan ad campaign
E
10
G
Conduct ad campaign
2
H
Design package
G
10
I
Setup ad package
H
6
J
Package initial stocks
13
K
Order stock from manufacturer
A
9
L
Select distributors sell
K
3
M
Ship stocks to distributors
L
5
Draw Network diagram
Indicate critical path
For each non critical activity, find total free float
07
Q.5
The Orange bus company manufacture buses for different purposes.
The Orange bus objective is to provide expert, bespoke minibus conversions for individual customers, companies and charities. The corporate ethos of 'driving quality' focuses the company to continuously look at improving the quality and effectiveness of its products and services. This is demonstrated through high staff morale, increased sales and most importantly satisfied customers. Although The Orange bus was already successfully measuring the quality of its builds and processes informally, the company wanted to put in place a more formal structure to improve operational efficiency and drive market share. The Orange bus decided that a quality certificate would provide the ideal framework to achieve this.
Successful certification may enable The Orange bus to gain national recognition as a quality company which consistently builds a high quality product. The majority of motor manufacturers insist on certification to this standard and The Orange bus has, subsequently achieved national accreditation and approval from these manufacturers due to its outstanding quality.
Auditing is performed monthly and continues to highlight opportunities for process improvements. Non-conformities and corrective actions are religiously logged, enabling The Orange bus to learn from mistakes and put in place initiatives to prevent recurrences of problems. Now that the company monitors each stage of the vehicle build, preventative action means that warranty costs have substantially reduced. The management system also helps the monitoring of customer feedback. As a result of this feedback, the company now offer a 36-month warranty which demonstrates firstly that they do listen to our customers, and, secondly
14
Page 4 of 4
that they have confidence in the build quality of the product. The only other obstacle they faced was helping staff understand why they were implementing certification.
Explain the quality tool that can be applied in the above case?
How will the employees access their role in quality management?
OR
Q-5
The following table gives data on normal time, cost and crash time and cost for a project.
Activity
Normal time
Normal cost
Crash time
Crash cost
1-2
3
300
2
400
2-3
3
30
3
30
2-4
7
420
5
580
2-5
9
720
7
810
3-5
5
250
4
300
4-5
0
0
0
0
5-6
6
320
4
410
6-7
4
400
3
470
6-8
13
780
10
900
7-8
10
1000
9
1200
Indirect cost is Rs. 50 per week.
1)Draw network diagram for project identify the critical path.
What are the normal project duration associated cost?
Find out the total float associated with each activity.
4)Crash the relevant activities systematically determine the optimal project completion time and cost.
14
Other Question Papers
Subjects
- accounting for managers
- accounting for managers (afm)
- advance marketing management
- applied pharmaceutics
- b2b marketing
- banking and insurance
- banking and insurance -ii
- brand marketing
- business analytics (ba)
- business communication
- business english (be)
- business environment
- business ethics
- business ethics and corporate governance (becg)
- business law for managers
- business mathematics
- business process reengineering
- business process reengineering (bpr)
- business statistics
- business statistics (bs)
- business structure and management
- business structure and process
- change management & organization development
- change management and organizational development
- company law
- compensation management
- computer applications
- constitution of india
- consumer behavior (cb)
- consumer behaviour
- cooperative management
- corporate accounting (ca)
- corporate restructuring
- corporate tax planning
- corporate taxation (ct)
- corporate taxation and financial planning (ct & fp)
- cost & management accounting (cma)
- cost and management accounting
- counseling skills for managers
- creativity and innovation
- creativity, incubation and innovation (cii)
- cross continent business philosophy
- cyber security and it governance (csitg)
- database management
- designing of operations system (dos)
- development of human skills
- digital marketing
- e-commerce
- ecological management & business
- economics for managers (efm)
- effective communication skills
- elements of direct & indirect taxes
- elements of financial accounting
- english language
- enterprise resource planning
- entrepreneurial finance (ef)
- entrepreneurship
- environment for business
- environment management
- export – import policy, procedure documentation
- export-import policy procedures & documentation
- export-import procedures
- family business management
- financial accounting
- financial management
- financial planning
- foreign exchange management
- foreign language-french
- french (foreign language)
- fundamentals of information technology
- fundamentals of marketing (fom)
- gandhian philosophy for managing business (gpmb)
- german (foreign language)
- global human resource management (ghrm)
- healthcare and hospital management
- human resource development
- human resource management
- human resource management.
- human skills
- human values & business ethics (hvbe)
- import export procedures
- income tax (it)
- indian economy
- indian ethos & human quality development
- information system audit and control
- information systems
- information technology and global business
- integrated marketing communication
- integrated marketing communication (imc)
- intellectual property rights
- international accounting practice
- international business
- international business (ib)
- international commercial law (icl)
- international economic environment (iee)
- international economics (ie)
- international finance
- international financial management (ifm)
- international human resource management
- international human resource management (ihrm)
- international marketing
- international supply chain management
- inventory management, material planning and management
- inventory management, materials planning and management
- investment banking (ib)
- labor law
- leadership
- legal aspects business
- legal aspects of business
- legal aspects of business (lab)
- macro economics (me)
- management accounting
- management control system
- management control systems
- management information system
- management of cooperatives
- management of financial planning (mfp)
- management of financial services (mfs)
- management of industrial relation and labour law
- management of industrial relations and labour laws (mir & ll)
- management principles
- managerial communication
- managerial communication (mc)
- managerial economics
- managerial economics(me)
- managing digital innovation and transformation (mdit)
- marketing management
- marketing research (mr)
- material management
- mergers and acquisitions
- micro economics
- micro small and medium enterprise
- multicultural organizational behavior (mob)
- new entrepreneurship & innovation management
- new venture creation
- operation management
- organisational dynamics
- organizational behavior
- organizational behaviour
- performance management (pm)
- principles of management (pm)
- product & brand management (pbm)
- product and brand management
- product design and development
- production & operations management (pom)
- production and operations management
- production management
- project management
- project management for entrepreneurs
- public relation management
- quantitative analysis - ii
- quantitative analysis (qa)
- quantitative analysis-i
- relational database management system (rdbms)
- research methodology
- research methodology (rm)
- retailing - ii
- retailing and franchising (rf)
- risk management
- rural marketing
- sales & distribution management
- sales and distribution management (sdm)
- security analysis & portfolio management
- security analysis & portfolio management (sapm)
- service marketing
- services and relationship marketing (srm)
- social entrepreneurship
- social media analytics (sma)
- strategic financial management
- strategic financial management (sfm)
- strategic human resource management
- strategic information technology management
- strategic management
- supply chain & logistics management
- supply chain and logistics management
- supply chain management
- supply chain management (scm)
- system analysis and design
- system analysis and design(sa&d)
- talent management
- technology and business
- technology management
- total quality management and world class manufacturing excellence (tqmwcme)
- tourism and hospitality management (thm)
- wto multilateral trading system and it’s impact on business
- wto multilateral trading system and its impact on business(wmts-i)