Exam Details
Subject | software engineering | |
Paper | ||
Exam / Course | m.c.a.commerce | |
Department | ||
Organization | savitribai phule pune university | |
Position | ||
Exam Date | April, 2018 | |
City, State | maharashtra, pune |
Question Paper
Total No. of Questions—5] [Total No. of Printed Pages—3
Seat
No. [5361]-16
M.C.A. (Commerce Faculty) (First Semester)
EXAMINATION, 2018
106 SOFTWARE ENGINEERING
(2008 PATTERN)
Time Three Hours Maximum Marks 80
N.B. All questions are compulsory.
(ii Figures to the right indicate full marks.
(iii Draw Diagram whenever necessary.
1. Solve the following case study
Workers in an engineering unit are paid incentive wages on the
basis of additional output as compared to the norms. The daily
expected output of each worker is recorded on a form by the departmental
foreman based on requirements conveyed to him by the production
control department and norms laid down by industrial engineering
department. The actual daily output is recorded on the same form,
against the expected output, which is signed by both the worker
and the foreman. A copy of this report is forwarded to quality
control who records "quantity accepted" against "quantity produced"
column in the production report. This is then submitted to the Time
office clerk who computes daily incentives amount payable
P.T.O.
[5361]-16 2
based on a table and records it in register. Monthly, worker-byworker
totals from this register are transferred to the pay sheet
at the end of each month.
Draw the following
Context Level Diagram.
First Level Data Flow Diagram.
Structure Chart.
2. Answer the following (any four)
Prepare a Decision Table for the following case. An Inventory
control procedure rules are given below
If the stock-in-hand is maximum level, then any batch
on order is cancelled.
(ii If the stock-in-hand has dropped to or below the reorder
level, an order is placed unless a batch is already
on order in which case it is chased it overdue.
(iii If re-order level stock-in-hand is maximum level, any
batch on order is delayed.
When the stock-in-hand has dropped to the danger level
any batch on order is chased otherwise a rush order
is placed.
What is test data generators
Define quality. Explain capability maturity model in detail.
Give the benefits of prototyping.
Write the principles of coupling.
[5361]-16 3 P.T.O.
3. Explain the following in details (any four)
Explain system with its types.
Explain the role of system analyst.
Explain why normalization is necessary.
Explain data Dictionary with its contents.
Explain cohesion with its types.
4. Write notes on the following (any four)
ISO standards
Reverse Engineering
Software Maintenance
Testing process
Spiral Model.
5. Differentiate between (any four)
White Box Testing and Black Box Testing.
Structured Interview and unstructured interview.
Software product and software project.
System Approach and system Analysis.
Physical DFD and Logical DFD.
Seat
No. [5361]-16
M.C.A. (Commerce Faculty) (First Semester)
EXAMINATION, 2018
106 SOFTWARE ENGINEERING
(2008 PATTERN)
Time Three Hours Maximum Marks 80
N.B. All questions are compulsory.
(ii Figures to the right indicate full marks.
(iii Draw Diagram whenever necessary.
1. Solve the following case study
Workers in an engineering unit are paid incentive wages on the
basis of additional output as compared to the norms. The daily
expected output of each worker is recorded on a form by the departmental
foreman based on requirements conveyed to him by the production
control department and norms laid down by industrial engineering
department. The actual daily output is recorded on the same form,
against the expected output, which is signed by both the worker
and the foreman. A copy of this report is forwarded to quality
control who records "quantity accepted" against "quantity produced"
column in the production report. This is then submitted to the Time
office clerk who computes daily incentives amount payable
P.T.O.
[5361]-16 2
based on a table and records it in register. Monthly, worker-byworker
totals from this register are transferred to the pay sheet
at the end of each month.
Draw the following
Context Level Diagram.
First Level Data Flow Diagram.
Structure Chart.
2. Answer the following (any four)
Prepare a Decision Table for the following case. An Inventory
control procedure rules are given below
If the stock-in-hand is maximum level, then any batch
on order is cancelled.
(ii If the stock-in-hand has dropped to or below the reorder
level, an order is placed unless a batch is already
on order in which case it is chased it overdue.
(iii If re-order level stock-in-hand is maximum level, any
batch on order is delayed.
When the stock-in-hand has dropped to the danger level
any batch on order is chased otherwise a rush order
is placed.
What is test data generators
Define quality. Explain capability maturity model in detail.
Give the benefits of prototyping.
Write the principles of coupling.
[5361]-16 3 P.T.O.
3. Explain the following in details (any four)
Explain system with its types.
Explain the role of system analyst.
Explain why normalization is necessary.
Explain data Dictionary with its contents.
Explain cohesion with its types.
4. Write notes on the following (any four)
ISO standards
Reverse Engineering
Software Maintenance
Testing process
Spiral Model.
5. Differentiate between (any four)
White Box Testing and Black Box Testing.
Structured Interview and unstructured interview.
Software product and software project.
System Approach and system Analysis.
Physical DFD and Logical DFD.
Other Question Papers
Subjects
- advance java
- advanced database management system
- advanced networking
- advanced operating system
- advanced web programming
- business and professional skills
- business communication
- business strategies
- content management system
- core java
- cyber law and ethics
- data structure using-c
- data warehousing and data mining
- database management system
- distributed database system
- e-commerce practices andtechnologies
- element of statistics
- elements of mathematics
- financial and investment analysis
- fundamental of informationtechnology
- human resource management
- information system audit
- it project management
- knowledge management for business
- m-commerce
- management information system
- mobile communication
- networking operations
- numerical and statistical methods
- oop’s using c++
- operating system
- operating systems
- principles of management
- programming fundamentals : ‘c’ programming
- programming in ‘c’
- relational database management systems
- software engineering
- system analysis and design
- system organisation and management
- system simulation and modeling
- visual programming
- web technologies