Discuss the importance of load forecasting in power system planning.
What are the conditions to be applied on quantitative forecasting?
Explain the problems faced by electricity industry for planning and forecasting.
What is long-term load forecasting Explain multivariate procedures in brief
Describe the factors affecting accuracy of forecasting methods.
Discuss the role of forecasting in planning. What are the criteria for the selection of forecasting method?
4. The following table shows the amount spent by different customers in a shop. Using least square estimates, calculate SSE (sum of squared errors) and MSE (mean squared errors) for an average spend of 7 and 12
Customer Amount Spent
1 9
2 8
3 9
4 12
5 9
6 12
7 11
8 7
9 13
10 9
11 11
12 10
Explain the time horizon effects on forecasting methods.
Why is generation planning not suitable before load forecasting?
Explain fundamental economic analysis for generation planning optimized according to different categories of generating unit.
Discuss the significance of planning and forecasting of distribution and transmission systems.
7. Write short notes on the following:
Time series forecasting
Spatial load forecasting
Need of forecasting and planning
Difference between long-term and short-term forecasting
What are the conditions to be applied on quantitative forecasting?
Explain the problems faced by electricity industry for planning and forecasting.
What is long-term load forecasting Explain multivariate procedures in brief
Describe the factors affecting accuracy of forecasting methods.
Discuss the role of forecasting in planning. What are the criteria for the selection of forecasting method?
4. The following table shows the amount spent by different customers in a shop. Using least square estimates, calculate SSE (sum of squared errors) and MSE (mean squared errors) for an average spend of 7 and 12
Customer Amount Spent
1 9
2 8
3 9
4 12
5 9
6 12
7 11
8 7
9 13
10 9
11 11
12 10
Explain the time horizon effects on forecasting methods.
Why is generation planning not suitable before load forecasting?
Explain fundamental economic analysis for generation planning optimized according to different categories of generating unit.
Discuss the significance of planning and forecasting of distribution and transmission systems.
7. Write short notes on the following:
Time series forecasting
Spatial load forecasting
Need of forecasting and planning
Difference between long-term and short-term forecasting
Other Question Papers
Departments
- Centre for Corporate Education, Training & Consultancy (CCETC)
- Centre for Corporate Education, Training & Consultancy (CCETC)
- National Centre for Disability Studies (NCDS)
- School of Agriculture (SOA)
- School of Computer and Information Sciences (SOCIS)
- School of Continuing Education (SOCE)
- School of Education (SOE)
- School of Engineering & Technology (SOET)
- School of Extension and Development Studies (SOEDS)
- School of Foreign Languages (SOFL)
- School of Gender Development Studies(SOGDS)
- School of Health Science (SOHS)
- School of Humanities (SOH)
- School of Interdisciplinary and Trans-Disciplinary Studies (SOITDS)
- School of Journalism and New Media Studies (SOJNMS)
- School of Law (SOL)
- School of Management Studies (SOMS)
- School of Performing Arts and Visual Arts (SOPVA)
- School of Performing Arts and Visual Arts(SOPVA)
- School of Sciences (SOS)
- School of Social Sciences (SOSS)
- School of Social Work (SOSW)
- School of Tourism & Hospitality Service Sectoral SOMS (SOTHSM)
- School of Tourism &Hospitality Service Sectoral SOMS (SOTHSSM)
- School of Translation Studies and Training (SOTST)
- School of Vocational Education and Training (SOVET)
- Staff Training & Research in Distance Education (STRIDE)
Subjects
- Power Electronics
- Power System Planning And Load Forecasting